1.Mixing ratio (weight ratio):100:28
2.Construction time limit:10℃-100 minutes
23℃-50 minutes
30℃-30 minutes
3.Density:(23℃):1.45g/cm3
4.Flexibility/mm :<2
5.Compressive strength/N.cm:490
6.Curing temperature:>8℃
7.Construction interval(23℃):1-3h
8.Fully cured:7 days
9.Linear shrinkage:0.2%
10.Volume shrinkage:2%
11.Wear resistance(750g/300r):0.025g
1.Ground requirement:The concrete surface should be dry, clean, with a certain degree of roughness, no loose base, no oil stains and other obstacles to bond debris. If necessary, the surface treatment we can use sandblasting machine, ground sander, high – pressure water gun.
2.Application methods:It can be applied by scraping (rubber scraper or saw blade scraper).
3.Material dosage (self-leveling) : 1.5 Kg/㎡.